✓Everything else looks good. 14 jobs running on time.
Needs confirmation
Water heater install, 4521 N 19th Ave
Rosa booked the 8 to 10 AM window and has not confirmed yet. Marcus is staged to roll at 8:00. Confirming texts Rosa and locks the window.
One tap clears this. Keyboard: press c to confirm the highlighted card.
Approve textNothing sends until you approve
Sewer camera inspection, 2204 W Osborn
Priya is running about 30 minutes behind. This text to Tom is drafted and waiting on you.
Draft to Tom
Hi Tom, this is Desert Flow Plumbing. Priya is running about 30 minutes behind and should arrive around 10:00 AM. Reply here if that still works for you.
Needs a tech
Kitchen drain clog, 8832 E McDowell
Mike booked overnight from the website. No tech assigned yet. The 11:30 AM slot is open. Tap a tech to assign.
Missed call
Mike called at 6:42 AM, nobody picked up
The automatic text-back already went out. His replies come straight to you, not to a tech.
Reschedule requestFrom the booking link
Toilet rebuild, 7710 N 43rd Ave
Sarah asked to move from today to Thursday. The link takes requests, it does not decide. This stays your call.
Waiting on reply
Tom asked about the camera footage
In Messages, 22 minutes ago: "Do I get a copy of the camera video?" He is waiting on you.
Running behind
Marcus is about 35 minutes behind
Water softener install, 12930 W Thunderbird may slip past 3:30 PM. Luis has a hard stop at 4:00.
✓
Nothing needs you.
14 jobs running on time.
This is the whole point. The routine runs itself, and we will flag you the moment something needs a human. Go drink your coffee.
Handled today (0)
Shortcutsj/k movec confirma assigne edit texts skip1-4 tabs? all shortcuts
Tap a job, then tap a tech column to move it. The customer text sends after a 10 second undo window. Elena is paired with Marcus today and does not take her own jobs.
Unassigned
11:30 AM
Kitchen drain clog
8832 E McDowell, Mike
Needs tech$189
Marcus 2 jobs
Elena riding along today
8:00 AM
Water heater install
4521 N 19th Ave, Rosa
On site$1,900
1:00 PM
Water softener install
12930 W Thunderbird, Luis
35 min behind$2,400
Priya 2 jobs
9:30 AM
Sewer camera inspection
2204 W Osborn, Tom
En route$349
2:00 PM
Main line cleanout
7702 W Glendale Ave, Ana
Scheduled$425
Sam 2 jobs
9:00 AM
Toilet rebuild
7710 N 43rd Ave, Sarah
Scheduled$425
12:30 PM
Faucet replacement
9012 N 27th Ave, Greg
Scheduled$260
Today, Wed Sep 23
8:00 AMWater heater install, 4521 N 19th Ave (Rosa)Marcus
9:00 AMToilet rebuild, 7710 N 43rd Ave (Sarah)Sam
9:30 AMSewer camera inspection, 2204 W Osborn (Tom)Priya
11:30 AMKitchen drain clog, 8832 E McDowell (Mike)Unassigned
12:30 PMFaucet replacement, 9012 N 27th Ave (Greg)Sam
1:00 PMWater softener install, 12930 W Thunderbird (Luis)Marcus
2:00 PMMain line cleanout, 7702 W Glendale Ave (Ana)Priya
Tomorrow, Thu Sep 24
8:30 AMWater heater flush, 4410 W Cactus Rd (Diane)Marcus
10:00 AMToilet rebuild, 7710 N 43rd Ave (Sarah)Sam
1:30 PMSewer camera inspection, 8820 N 35th Ave (Paul)Priya
Quiet hours 7:00 AM to 9:00 PM. Automated texts only go out inside that window. Anything scheduled overnight waits until 7:00 AM, and approval cards from you can go any time.
Sarah New
Review link sent. Waiting on her reply.
Tom New
Do I get a copy of the camera video?
Mike
Hi, my kitchen sink is backing up. Can someone come today?
Sarah, Toilet rebuild
7710 N 43rd Ave, Sam on the job
Quiet hours 9 PM to 7 AM. Texts queue until morning.
Marcus, today
Wed, Sep 23
2 jobs, Elena riding along
Online, simulate offline
You are offline. Changes will sync when you are back.
Water heater install
4521 N 19th Ave
Rosa, 8 to 10 AM window
Amount owed
$1,900 total
Cards are not processed here. Record cash or check only.
Water softener install
12930 W Thunderbird
Luis, 1:00 PM, hard stop at 4:00
Day total collected$0
Tech view shortcutso toggle offline? all shortcuts
Keyboard shortcuts
j / k
Move through the queue
c
Confirm the highlighted card's main action
a
Assign (first tech option on the highlighted card)